Casting aspiration #2

Full project in Design and Build

According Customer request, this aspiration system is covering :

  • 2 Tilting Casting Benches
  • Extraction Zone and Travelling Zone to Cooling Tunnel

Aspiration Capacity : 36 000 m3/h. Controlled and Approved by Bureau Veritas ( Notified Body )

Project Details
  • Client: MONTUPET SA
  • Function: Evacuation of casting fumes