Pre-study and complete analysis for production flow optimization:
- New second floor platform storage inside existing building Infrastructure
- Platform above casting lines with 4 industrial lifts for production access
- Production transfer by AGV trolley, on platform, from Core Shop zone to Casting zone
- Project designed for 6 casting line ( 288 casted parts by hour – 205 trolleys by hour ) as requested by Customer